Skip to content
Skip to content
Welcome to Perfect Pollucon Services Office Hours: 10:00am-7:00pm
Perfect Pollucon Services

Perfect Pollucon Services

Environmental Consultant & Laboratory

Call Us 9967436537
Mail Us [email protected]
Maharashtra, India 3 Krishna Koyna B, Majiwada, Thane W
  • Home
  • Monitoring Services
    • Ambient Air Quality Monitoring & Testing
    • Indoor Air Quality Monitoring & Testing
    • Air Quality Monitoring & Testing
    • Stack Emission Monitoring & Testing
    • Noise Level Monitoring & Testing
    • Food Testing Laboratory Services
    • Fugitive Emission Monitoring & Testing
    • Soil Testing & Investigation Laboratory
    • Drinking Water Quality Testing & Analysis Laboratory
    • Corrosion Testing Services
    • Illumination Survey / Lux Monitoring
    • Ventilation Survey
  • Consultancy Services
    • Environmental Impact Assessment
    • Environmental Statement Form V
    • MPCB Consent to Establish, Operate and Renewal
    • Operation and maintenance of Effluent Treatment Plant
    • Effluent Treatment Plant Design
    • Six Monthly EC Compliance Report
    • Self Audit Report MPCB
    • Environmental Compliance
  • Industries
    • Pharmaceutical Industries
    • Chemical and Petrochemical Industry
    • Construction & Real Estate
    • Oil and Gas Or Petroleum Industry
    • Manufacturing / Production Industry
    • Corrosion Control at Data Center / IT Industry
    • Mining and Mineral Extraction
    • Food & Cold Storage Industry
    • Supply Chain & Warehouses
    • Data Centres
    • Railways & Metro Projects
    • Hospitality & Tourism
    • Retail and Shopping Malls
  • Blog
  • Tools
    • Air Monitoring Calculators
    • Stack Monitoring Calculators
    • Noise Monitoring Calculators
    • Carbon & Energy Footprint Calculators
    • Lux & Illuminance Calculators
    • ETP & STP Calculators for Form-V
    • ETP Design Calculators
  • About Us
    • Vision
    • Why We Built EHSSaral?
    • Our Work and Clients
    • Case Studies
    • Testimonials & Leave Us a Review
    • Trusted Partners
    • Careers
    • Guest Posting – Write for Us
    • Press Release
    • Our Features
  • Contact Us
REQUEST A QUOTE
CPCB Guidelines for Construction Sites – 2025 Checklist & Updates
Tanaji Gajare

CPCB Guidelines for Construction Sites – 2025 Checklist & Updates

🌱 Last updated: July 20, 2025

CPCB Guidelines for Construction Sites: 2025 Rules Made Simple

Looking for the CPCB Guidelines for Construction Sites? Our 2025-compliant checklist breaks down the latest CPCB SOPs and Waste Rules so you’re always audit-ready. Why CPCB Cares About Construction Sites – and What You’re Expected to Know (as a Junior EHS Officer) from Industry experts with expirience of 25+ years in Environmental Monitoring Field in India.


Dear Junior Officer,

Welcome to your first construction site posting. You’re probably overwhelmed-new company, new team, and now you’re told:

“Make sure we follow CPCB norms or we’ll get a notice.”

But what exactly are those norms?
Where do they start? Where do they end?
And most importantly:
What is your role in this puzzle?

Let’s decode that-step by step.


Why CPCB Monitors Construction Projects So Strictly

Construction isn’t just about building structures.
It’s also about how you disturb air, soil, water, and public life in the process.

The Central Pollution Control Board (CPCB) monitors construction sites because:

  • Fine dust (PM10/PM2.5) from debris harms air quality
  • Water runoff from construction contaminates nearby drains or water bodies
  • Noise pollution from cutting, welding, and movement of machinery can exceed safe limits
  • Waste (like cement bags, broken tiles, thermocol) is often dumped illegally
  • Local residents often file complaints-sometimes directly to NGT or CPCB portals

So CPCB is NOT just acting on theory. It is responding to real, visible issues.

Noise Pollution Rules in India: CPCB Limits and Legal Penalties

🔍 Typical CPCB Focus Areas (Based on Our 25+ Years of Site Work)

Focus AreaWhy CPCB Monitors It
Dust generationPM2.5/PM10 pollution from debris and sand
Uncovered materialWind spreads dust from loose piles
NoiseJackhammers, drilling, and loading machines
Construction WasteImproper segregation and illegal dumping
Tree cuttingWithout permission → biodiversity loss
Water usageNon-potable or borewell water without record
Lack of signagePublic awareness boards missing
No AQI display boardMandatory in many Tier-1 cities
No green netting or fencingAir and visual pollution for passersby

What’s New in the 2025 CPCB Rules?

CPCB (Central Pollution Control Board) updated its Construction & Demolition (C&D) Waste Rules in 2025. Here’s what changed:

  • All sites (even below 20,000 sq. m) must now log dust control measures weekly.
  • Mandatory display boards showing waste handling plan at site entrances.
  • Fine amounts for non-compliance have increased up to ₹2 lakh per violation.
  • Daily wheel wash and debris cover checks must be recorded and stored for 90 days.

These updates apply to every contractor, builder, and project manager — no matter the project size.


What You, As a Junior EHS Officer, Are Expected to Know (Even If No One Tells You)

You are not just a form-filler or poster guy.
You are the bridge between:

✅ Government rules
✅ Site engineers
✅ Contractors
✅ Top management

Here’s what we suggest every junior EHS officer does in their first 30 days:

TaskWhy It Matters
Read the latest CPCB and SPCB circularsMost site fines are due to outdated practices
Walk around the site with your own logbookDon’t just depend on what the supervisor says
Speak to the civil engineer or site supervisorYou need their buy-in for any improvement
Take photos (before/after) of critical areasHelps in audits, especially for dust and fencing
Start a simple Excel for daily complianceYou’ll thank yourself during monthly reports

📝 Real Tip from PPS:
We once avoided a ₹5 lakh fine in Pune just because the EHS officer had timestamped photos of sprinkling being done that week. That one folder saved the project.

  • CPCB Construction & Demolition Waste SOP (2017)
  • CPCB Dust Mitigation Measures & Environmental Management SOP

The 14-Point CPCB Guidelines for Construction Sites – Explained Like a Mentor

In 2017, CPCB issued a landmark notification for Construction & Demolition (C&D) Waste Management under the Solid Waste Management Rules, 2016.

You can find comprehensive tips in the CPCB waste management guidelines that outline proper disposal procedures.

But apart from the rules, most EHS officers are judged on a practical list of 14–15 things at site level.

🛠️ CPCB Requirement✅ What It Means On-Site
1. Screens/Sheets around the SiteGreen or blue netting around full boundary to trap dust
2. Covered Material StorageSand, cement bags, bricks to be stored under tarpaulin/sheds
3. On-Site Roads Paved/SprinkledWater sprinkling twice daily on internal roads
4. Truck Tyre WashingBefore vehicle exits the site, tyres must be cleaned to avoid dust on roads
5. Covered VehiclesTrucks carrying debris must be tarpaulin-covered
6. On-Site Dust MonitoringBasic PM2.5/PM10 devices or AQI boards if in Tier-1 cities
7. Signage BoardsDetails of project, pollution control measures, and helpline info
8. Demolition Dust ControlDuring building breaking, misting or curtain walls required
9. C&D Waste SegregationSeparate bins for concrete, tiles, wood, plastic, etc.
10. Legal Disposal ChannelSend waste to approved SPCB contractor or recycling site
11. Water Tanker LogsMaintain record of sprinkling (date, time, qty)
12. Vehicle LogsEntry-exit of debris trucks with manifest or slip
13. Noise Reduction MeasuresEnclose noisy equipment (DG sets, grinders)
14. No Open BurningStrictly no burning of wood, plastic, or other waste

Not all construction sites are treated the same under CPCB guidelines.

While the core environmental principles remain consistent, the actual documentation and compliance expectations vary based on the total built-up area of your project. For example:

  • A 3,000 sq.m. housing site may not need an AQI board.
  • A 25,000 sq.m. commercial tower must have an Environmental Management Plan (EMP) and daily photo logs.
AQI Display Boards Mandatory for Mumbai Sites

This is where many junior EHS officers make mistakes—by copying a checklist from another site without checking if it applies to their size and region.

To help you stay clear and confident during audits or site reviews, we’ve compiled a size-wise compliance comparison table based on our 25+ years of real-world experience across Maharashtra, Gujarat, Delhi-NCR, and southern India.

Use this table to:

  • Understand what is mandatory vs advisory based on site size
  • Avoid over-compliance in small sites (wasting time and money)
  • Avoid under-compliance in large projects (leading to SPCB notices)
  • Guide your civil or PMC team with facts during planning discussions

CPCB C&D Waste Management Rules, 2025

👇 Here’s your quick-reference table. Bookmark this or print it out for site folders.

Project SizeMandatory CPCB RequirementsOptional / Region-Specific Add-Ons
🟠 Less than 5,000 sq.m.✅ Water sprinkling
✅ Green netting or barrier
✅ Covered trucks
✅ Wheel washing (if heavy vehicle movement)
✅ Waste segregation bins
✅ Signboard with project and EHS contact
🔹 AQI board not required
🔹 EMP not mandatory
🔹 Dust monitoring is advisory
🔹 Training records usually not audited
🔵 5,000 – 20,000 sq.m.✅ All of the above plus:
✅ Wheel washing log
✅ Photo documentation of sprinkling
✅ Environmental training (monthly toolbox talk)
✅ Construction & Demolition (C&D) waste manifest
✅ Complaint register on-site
🔹 AQI display board may be required (check with local SPCB)
🔹 EMP submission varies by region
🔹 CCTV-backed proof during audit helps
🔴 More than 20,000 sq.m.✅ All above items
✅ EMP submission mandatory
✅ AQI display board showing PM10/PM2.5 data
✅ Photo log with timestamp of daily measures
✅ Dust suppression plan
✅ Wheel wash station with logbook
✅ Site-specific mitigation plan (may be requested by SPCB)
🔹 AI-based dust alerts (in Smart Cities)
🔹 GPS-tagged waste transport (pilot in some metros)
🔹 Solar-powered AQI boards preferred

What If You Miss One or Two?

Here’s the brutal truth from our 25+ years at PPS:

  • You don’t get a notice for missing 1–2 points.
  • You get noticed when you miss them repeatedly or your site becomes the subject of a citizen complaint.

Real-life Insight: In Mumbai and Pune, 80% of site inspections are triggered because someone nearby complained via NGT or CPCB grievance portals.

CPCB Guidelines For Environmental Monitoring

Best Practices That Help You Stay Ahead (Even When Audits Happen Suddenly)

📍 Situation✅ What a Smart EHS Officer Does
Dust increasing due to dry seasonIncreases sprinkling frequency and photos
New civil contractor joinsGives CPCB rule orientation on Day 1
No dust monitor?Use mobile AQI monitors or partner with local lab weekly
Low budget for signage/nettingUse branded reusable banners, collaborate with CSR team
Big crane enters siteCoordinates to clean nearby roads after heavy movement

Daily & Weekly Workflow of an EHS Officer on a Construction Site

(Beginner-Friendly Format You Can Print or Share With Your Team)

Whether you’re new or experienced, your job isn’t just documentation.
You’re the bridge between compliance and reality.

So here’s what your daily, weekly, and monthly EHS workflow can look like – built from real-world construction site audits we’ve done at PPS.


Daily Routine Checklist (Dust Control + Visual Compliance)

🕒 Time📋 Task🎯 Purpose
8:30 AMSite perimeter walkCheck for torn netting, litter, or open materials
9:00 AMDust sprinkling logWater tanker log signed by contractor supervisor
10:00 AMPhoto log of high-risk areasUpload to internal WhatsApp group or server
11:00 AMCheck if trucks are coveredTake one entry+exit photo for record
2:00 PMRe-sprinkling if windyUpdate record if extra trips made
4:30 PMUpdate EHS daily logbookMark ✓ against CPCB checklist items

📸 Bonus Tip: Use the same background wall while taking daily photos – it helps you prove before-after impact.


Weekly Compliance Tasks

📅 Day🔍 Activity📝 Notes
MondayInspect signage boardsAre contact numbers visible & updated?
TuesdayCheck material storageAny loose sand/cement exposed?
WednesdayFilter log of diesel gensetsIf applicable, clean filter or notify vendor
ThursdaySafety toolbox talkInclude CPCB points + photos of good practices
FridayContractor coordinationAsk civil/mechanical team for next week’s plan
SaturdayInternal mock auditUse PPS’s audit format or your company’s version

Monthly Reporting & Compliance Submission

📌 Task📂 Submission Format👥 Audience
AQI or Dust ReportPDF or ExcelEnvironment Officer / HO
Vehicle LogRegister PhotocopyProject Engineer
Manifest VerificationForm 10, SignedTSDF Partner or Consultant
Training RecordsAttendance Sheet + PhotosHR or Safety Department
EHS Monthly Summary1-Pager with PhotosProject Manager, Client (if required)

Field Wisdom: Create a “Compliance Folder” on Google Drive or internal SharePoint – with subfolders for each CPCB point and upload photos weekly. ‘

You can download Form 10 format from MPCB/CPCB site or ask your TSDF partner. Keep scanned copies on record.

When Guidelines Become Notices: What Really Happens

At PPS, we’ve been called into several project sites after SPCB notices were issued.
And let’s be blunt: by the time a notice comes, it’s already too late to hide.
But it’s not too late to learn.

Here’s what we’ve seen on the ground – and what every junior EHS officer must understand:


❌ Real Mistakes Made (And What It Led To)

❌ Mistake🚫 Consequence
Sprinkling done only when inspection is expectedSPCB officer took photos of dry, dusty roads → ₹50,000 penalty
AQI display board installed but always blankImmediate show-cause notice; non-functioning display = non-compliance
Debris dumped outside site boundaryComplaint by nearby resident → Visit by Pollution Control Officer
No documentation for vehicle washingCPCB checklist point marked “Not Applicable” → Inspector disagreed
Multiple trucks leaving without coversCaptured by citizen, went viral → Led to media attention and swift action

Keep TSDF / debris disposal vendor’s GST + SPCB approval copy on file.

Environmental Monitoring in Construction & Real Estate

Mistake vs Solution (Real Case Table)

❌ Mistake🚫 Result✅ What Should’ve Been Done
No photos taken of water sprinklingCouldn’t prove compliance → FinedDaily timestamped photo with site supervisor in frame
Used AQI board with no power backupBoard dead during inspectionUse solar + battery-supported display units (available under ₹12k)
Ignored complaints from neighborsSPCB officer arrived unannouncedMaintain logbook of community concerns + redressals
No training to labourers on dust controlOpen handling of cement bags caught on CCTVWeekly 15-min refresher with pictorial signs

💡 Learnings We Share With Our Clients (Straight from PPS 25+ Years)

  • Don’t do compliance for the inspector. Do it for your peace of mind – that if they walk in anytime, you’re ready.
  • Photos are your best friend. Timestamped photos from the same angle every day act as legal protection.
  • Community matters. Neighbors, nearby shops, and even society watchmen can file complaints.
  • Keep your vendors in check. Genset rental or AQI board vendors often miss updates – keep a log.
  • One mistake → entire site under suspicion. It only takes one complaint to trigger a full-scale audit.

CPCB Compliance Checklist for Construction Sites

🟢 = Daily | 🔵 = Weekly | 🟡 = Monthly | 🔴 = One-time Before Start
🗂️ Item🧪 What to Check✅ Frequency
Water SprinklingTimely, adequate, photo-proof, all routes🟢
Wheel WashingWorking system + logbook of usage🟢
Green NettingFixed properly at all heights and edges🟢
Covered TrucksBefore exit, driver logs + photographs🟢
AQI Display BoardWorking 24×7, updated data (PM10/PM2.5)🟢
Fly Ash HandlingProper silos, covered unloading zones🔵
Wet Mix PathsEntry-exit routes wet-mixed or paved🟢
Waste SegregationPlastic, wood, C&D in separate bins🔵
Complaint RegisterLogged, signed, responded🔵
Environmental Training LogPhotographic record of tool-box talks🟡
Environmental Management Plan (EMP)Submitted, implemented, available on site🔴
Consent Copies (CTE/CTO)Available physically & digitally🔴

Wet Mix Pathways
Entry and exit roads must be either paved or covered with wet mix macadam to prevent soil erosion and dust from vehicle movement. If roads are kaccha (unpaved), CPCB considers it high-risk for fugitive dust.

How India’s Construction Site Regulations Evolved Over the Years

(A Must-Know Timeline for Every Junior EHS Officer)

Before you jump into site-level dust control or waste handling, it’s critical to understand how and why these CPCB rules were introduced in the first place.

Many EHS juniors only know the latest circulars-but miss the full picture. In reality, India’s construction site compliance landscape has evolved over two decades, driven by rising pollution, public complaints, court orders, and CPCB interventions.

To help you stay ahead, we’ve compiled a timeline of major CPCB and MoEFCC regulations that shape today’s environmental responsibilities at construction sites. This table isn’t just academic-it shows the intent and escalation behind each rule, so you can explain it confidently during audits, inspections, or vendor discussions.

Print it. Bookmark it. Because real EHS leadership starts with context-not just checklists.

📅 Year📜 Guideline / Notification📌 Key Focus Areas✅ Mandatory Actions
2000Air (Prevention & Control of Pollution) Act reference for dust emissionGeneral air pollution from construction/demolitionDust control through basic watering and fencing
2010CPCB Guidelines on C&D Waste ManagementSegregation, reuse, dust controlNo open dumping, cover transport vehicles
2016Construction and Demolition Waste Management Rules, 2016 (MoEFCC)C&D segregation, reuse/recycle facilitiesOn-site collection bins, covered vehicles, tracking manifest
2018CPCB Guidelines on Dust Mitigation for Construction ActivitiesReal-time dust mitigation (PM10/PM2.5)Water sprinkling, wheel washing, green netting, covered sand
2019CPCB Circular to SPCBs on strict enforcement of mitigation normsMonitoring compliance, penalty enforcementMaintain photo records, submit EMP before starting work
2020National Green Tribunal (NGT) Order for Construction Dust ControlStrict real-time compliance and penalty for non-complianceInstall AQI boards, real-time dust monitors (for large sites)
2021CPCB Directions to Smart Cities/SPCBsSmart environmental controls at urban construction sitesAI-based dust alerts, GPS monitoring for waste transport
2022–23Local SPCB Guidelines (e.g., MPCB, DPCC) strengthening implementationRegion-specific AQI thresholds and penaltiesSite-specific mitigation plans, daily logs, contractor accountability

For full legal details, read the official CPCB C&D Waste Rules 2025.

Want to prepare your team for audits? Check our ETP Operator Problems & Checklist to avoid common mistakes.

✅ Summary of Key Mandatory Actions (As per latest CPCB Guidelines)

  • Water sprinkling: Every 2–3 hours during active work.
  • Green netting: Must cover scaffolding, materials, and debris.
  • Wheel washing: At entry/exit points; logbook maintained.
  • Covered vehicles: All transport trucks must be tarpaulin-covered.
  • AQI Display Boards: Real-time PM2.5/PM10 visibility at large sites.
  • Environmental Management Plan (EMP): Mandatory for projects >20,000 sq.m.
  • Community complaint register: Must be maintained and displayed.
  • Fly ash/mortar handling: In sealed silos or covered enclosures.

EMP should cover dust mitigation, water use, waste disposal, monitoring plan, grievance redressal, and emergency preparedness.


Photo Log Tracker Format

DateActivityPhoto Taken?Supervisor InitialRemarks
12-Jul-2025Water sprinkling✅R.K.Done at 8 AM & 4 PM
12-Jul-2025Wheel wash✅R.K.One truck missed, warned vendor

Use a printed log on site – inspectors appreciate handwritten, physical records.

Pro Tip: Always name your files like Sprinkling_12Jul2025_8AM.jpg – makes it easier to trace during inspections.


Community Complaint Log Template

DateSourceComplaintAction TakenClosed?
11-Jul-2025A-Block ResidentDust blowing in eveningEvening sprinkling added✅

WhatsApp-Ready Summary for Your Site Manager

Sir, for full CPCB compliance, please ensure:
– 2x Daily water sprinkling (with timestamped photo)
– All trucks are covered before exiting
– AQI board functional 24×7 (PM10/PM2.5 shown)
– Waste bins separated and labeled
– Community complaints logged and closed

✅ Now you’re not just “aware” of CPCB rules. You’re ready to implement and protect your site.


✅ Reviewed by Our Expert Leadership Team

This guide is created and reviewed by senior environmental professionals with 10–40 years of experience helping construction companies meet CPCB and SPCB rules.

Tanaji Gajare

Tanaji S. Gajare

Founder & Chairman
40+ years guiding builders and industries through CPCB/SPCB compliance audits.

Anil Shelke

Anil Shelke

Executive Director
30+ years running on-site audits and training teams to meet CPCB rules.

❓ Frequently Asked Questions

Q1. Is AQI Display Board mandatory for all construction sites?

A: No. AQI boards are typically mandatory for large projects above 20,000 sq.m. as per CPCB and SPCB directives. Smaller sites may be exempt, but it’s good practice to install one for transparency and safety.

Q2. What are the CPCB fines for non-compliance at construction sites?

A: Penalties can range from ₹10,000 to ₹5,00,000 depending on the severity and repetition. Frequent citizen complaints or lack of documentation (like sprinkling logs, waste disposal) often trigger inspections and fines.

Q3. How often should water sprinkling be done on-site?

A: Ideally 2–3 times a day, especially during dry or windy conditions. Always keep timestamped photos to prove compliance during inspections.

Q4. What are the mandatory documents to be maintained on a construction site?

A: Keep printed/digital copies of the Environmental Management Plan (EMP), Consent to Establish/Operate (CTE/CTO), waste disposal manifests (Form 10), training logs, AQI records, and complaint registers.

Q5. What is the role of a junior EHS officer in CPCB compliance?

A: Junior officers must ensure site-level implementation of CPCB norms like dust control, netting, wheel washing, and waste segregation. They should maintain daily records, conduct toolbox talks, and coordinate with civil teams.

Q6. Can photos be used as proof of CPCB compliance?

A: Yes. Timestamped before-after photos are one of the strongest forms of evidence during SPCB inspections or legal disputes. Keep them organized by date and activity.

Q7. Where can I find the latest CPCB notifications?

A: Visit the official [CPCB website](https://cpcb.nic.in/) under the “Notifications” or “Publications” section, or check your State Pollution Control Board (SPCB) for local guidelines.

For official CPCB updates and circulars, you can refer to the Central Pollution Control Board (CPCB) website. It regularly publishes guidelines on dust control, C&D waste handling, and urban construction compliance.

To understand the legal framework behind environmental laws, the Ministry of Environment, Forest and Climate Change (MoEFCC) provides comprehensive notifications including the Construction & Demolition Waste Management Rules, 2016.

State-specific updates, especially for Maharashtra projects, are available on the Maharashtra Pollution Control Board (MPCB) portal. Contractors working in Mumbai, Pune, or Nagpur must stay aligned with local SPCB guidelines.

Related Posts:

  • ventilaton survey or air change survey by Perfect Pollucon Services
    Ventilation Survey
  • CPCB Guidelines for Waste Management Complete Industry Guide by Perfect Pollucon Services
    CPCB Guidelines for Waste Management – Industry Guide
  • How to measure Indoor Air Quality - Perfect Pollucon Services
    How to Measure Indoor Air Quality?
  • EHS Junior Officer's Guide Real Tips from 25 Years in Field by Perfect Pollucon Services
    EHS Junior Officer's Guide: Real Tips from 25+ Years…
  • must read environmental books - perfect pollucon services
    20+ Best Environmental Books (Indian & Global)…
  • Best Air Purifiers for Home in India by Perfect Pollucon Services
    Best Air Purifiers for Home in India (2025) – Tested…
  • Choosing the Right Environmental Lab 7 Key Checks for EHS Officers by Perfect Pollucon Services
    Choosing the Right Environmental Lab: 7 Key Checks…
  • Environmental health safety managers responsibilities
    EHS Environmental Health and Safety Roles & Responsibilities
  • Ambient and in-plant workzone noise level monitoring by Perfect Pollucon Services V1
    Noise Level Monitoring & Testing
  • CPCB Drinking Water Standards IS 10500 & BIS by Perfect Pollucon Services
    CPCB Drinking Water Standards, Water Quality…
  • Effects of Diwali Fireworks
    Effects of Fireworks in Diwali
  • environmental monitoring - perfect pollucon services
    Environmental Monitoring and Assessment

Post navigation

Why Some EHS Officers Grow Faster Than Others | PPS Insights
CPCB Guidelines for Waste Management – Industry Guide

0 / 180

Environmental Monitoring Services

  • Ambient Air Quality Monitoring & Testing
  • Indoor Air Quality Monitoring & Testing
  • Air Quality Monitoring & Testing
  • Fugitive Emission Monitoring & Testing
  • Stack Emission Monitoring & Testing
  • Food Testing Laboratory Services
  • Noise Level Monitoring & Testing
  • Corrosion Testing Services
  • Ventilation Survey
  • Illumination Survey

Search

Download Our Brochure (682 kb)

Download Our Company Brochure

WhatsApp Chat with Perfect Pollucon Expert

Recent Posts

  • Dehumidifier Maintenance & Cleaning Tips for Indian Homes | Expert Guide by PPS
  • Understanding Ideal TDS, Hardness & Microbial Load in Water
  • Dehumidifier vs Air Purifier vs Humidifier: Expert Indian Guide
  • IAQ Testing for LEED & WELL Building | PPS Expert Guide
  • EC Compliance Report 2025 – Expert PPS Guide
  • RO vs UV vs UF Water Purifier: Which is Better in India?
  • Best Water Purifiers for Home in India (2025) – Lab Tested Reviews
  • How to Fill E-Waste Form 3 Annual Return (Step-by-Step)
  • SPCB Environmental Compliance Forms – The Ultimate Guide
  • How to Fill Form 10 Hazardous Waste Manifest -Step-by-Step Guide

Environmental Consultancy Services

  • Environmental Monitoring and Assessment
  • Environmental Impact Assessment
  • Effluent Treatment Plant
  • Effluent Treatment Plant Design
  • Consent to Establish, Consent to Operate and Renewal
  • Six Monthly EC Compliance Report
  • Self Audit Report MPCB
  • Environmental Compliance in India
  • Ventilation Survey
  • Tools
  • HTML Sitemap

Environmental Consultancy Services

  • Environmental Monitoring and Assessment
  • Environmental Impact Assessment
  • Effluent Treatment Plant
  • Effluent Treatment Plant Design
  • Consent to Establish, Consent to Operate and Renewal
  • Six Monthly EC Compliance Report
  • Self Audit Report MPCB
  • Environmental Compliance in India
  • Ventilation Survey
  • Tools
  • HTML Sitemap

Environmental Monitoring Services

  • Ambient Air Quality Monitoring & Testing
  • Indoor Air Quality Monitoring & Testing
  • Air Quality Monitoring & Testing
  • Fugitive Emission Monitoring & Testing
  • Stack Emission Monitoring & Testing
  • Food Testing Laboratory Services
  • Noise Level Monitoring & Testing
  • Corrosion Testing Services
  • Ventilation Survey
  • Illumination Survey

About Us

  • Home
  • Blog
  • Our Vision & Mission
  • About Us
  • Case Studies
  • Industries We Serve
  • Write for Us | Guest Posting
  • Privacy Policy
  • Terms and Conditions
  • Explore our EnviroTech platform: EHSSaral.com

Registered Office

Perfect Pollucon Services – Environmental Consultancy Company
3 Krishna Koyna B, Majiwada Thane,
Maharashtra, India
400601
Email: [email protected]
Phone :
+91 9137 039 315
+91 9930 180 059
+91 7045 651 859
Perfect Pollucon Services (proprietorship firm reg. 2009) is now Perfect Pollucon LLP (CIN : ACP-2349) (reg in Jun’2025)

  • Privacy Policy
  • Terms and Conditions
  • Contact Our Experts
  • Sitemap
@Copyright Perfect Pollucon Services
CPCB Guidelines for Construction Sites – 2025 Checklist & Updates