Skip to content
Skip to content
Welcome to Perfect Pollucon LLP Office Hours: 10:00am-7:00pm
Perfect Pollucon Services - Environmental Consultancy and Environmental Monitoring Services

Perfect Pollucon LLP

Environmental Consultant & Laboratory

Call Us 9967436537
Mail Us [email protected]
Maharashtra, India 3 Krishna Koyna B, Majiwada, Thane W
  • Home
  • Monitoring Services
    • Ambient Air Quality Monitoring & Testing Services
    • Indoor Air Quality Testing & Monitoring Services
    • Air Quality Monitoring & Testing Services
    • Airborne Particle Count Testing
    • Stack Emission Monitoring & Testing Services
    • Noise Level Monitoring & Testing Services
    • Food Testing Laboratory Services
    • Fugitive Emission Monitoring & Testing
    • Soil Testing & Investigation Laboratory
    • Drinking Water Quality Testing & Analysis Laboratory
    • Data Centre Corrosion Testing Services
    • Illumination Survey / Lux Monitoring
    • Airflow, Ventilation & ACH Testing Services
    • Noise Dosimetry Testing
  • Consultancy Services
    • Temperature and Relative Humidity Testing
    • Heat Stress & WBGT Assessment Services
    • Differential Pressure Testing & Cleanroom Pressure Mapping
    • Compressed Air Leak Detection & Ultrasonic Leak Survey
    • Electrical Thermography & Thermal Imaging Survey
    • Environmental Impact Assessment
    • Environmental Statement Form V
    • MPCB Consent to Establish, Operate and Renewal
    • Operation and maintenance of Effluent Treatment Plant
    • Effluent Treatment Plant Design
    • Six Monthly EC Compliance Report Service
    • Self Audit Report MPCB
    • Environmental Compliance
  • Industries
    • Pharmaceutical Industries
    • Chemical and Petrochemical Industry
    • Construction & Real Estate
    • Oil and Gas Or Petroleum Industry
    • Manufacturing / Production Industry
    • Corrosion Control at Data Center / IT Industry
    • Mining and Mineral Extraction
    • Food & Cold Storage Industry
    • Supply Chain & Warehouses
    • Data Centres
    • Railways & Metro Projects
    • Hospitality & Tourism
    • Retail and Shopping Malls
  • Blog
  • Tools
    • Air Monitoring Calculators
    • Stack Monitoring Calculators
    • Noise Monitoring Calculators
    • Carbon & Energy Footprint Calculators
    • Lux & Illuminance Calculators
    • ETP & STP Calculators for Form-V
    • ETP Design Calculators
  • About Us
    • Vision
    • Why We Built EHSSaral?
    • Our Work and Clients
    • Case Studies
    • Testimonials & Leave Us a Review
    • Trusted Partners
    • Careers
    • Guest Posting – Write for Us
    • Press Release
    • Our Features
  • Contact Us
REQUEST A QUOTE

Heat Stress & WBGT Assessment Services

Perfect Pollucon LLP provides heat stress assessment and Wet Bulb Globe Temperature (WBGT) monitoring services for factories, construction sites, warehouses, process plants and other workplaces in Mumbai, Thane, Navi Mumbai and industrial areas across Maharashtra.

We assess workplace thermal conditions alongside the work being performed, exposure duration, clothing and personal protective equipment (PPE). Our assessments help organisations identify heat-exposure concerns, prioritise controls and document findings for EHS reviews, occupational hygiene programmes and client audits.

Our services include indoor and outdoor WBGT measurement, task-based heat-exposure assessment, temperature and humidity monitoring, data logging, ventilation observations and practical recommendations.

Perfect Pollucon has provided environmental monitoring and consultancy services since 2007, supported by senior professionals with up to 40+ years of experience in environmental monitoring, pollution control and industrial compliance.

Planning a heat stress assessment? Share your facility location, processes, work areas, shift timings and audit requirements. Our technical team will help define the appropriate monitoring scope.

Request a Heat Stress Assessment

What Is a Heat Stress Assessment?

A heat stress assessment evaluates the thermal conditions workers encounter and the factors that affect their ability to manage that exposure. These include environmental heat, heat generated through physical work, clothing and PPE, exposure duration and opportunities for recovery.

A workplace assessment typically combines:

  • Measurements at representative work locations.
  • Identification of heat-generating processes and radiant heat sources.
  • Review of tasks and physical workload.
  • Consideration of clothing and PPE.
  • Review of work–rest patterns and worker movement between areas.
  • Consideration of acclimatisation.
  • Comparison with appropriate technical reference criteria.
  • Recommendations to reduce exposure.

A heat stress assessment goes beyond recording the room temperature. Two people working in the same area may face different levels of concern because their tasks, clothing and exposure patterns differ.

What Is WBGT?

WBGT stands for Wet Bulb Globe Temperature. It is a heat-stress index used to assess thermal conditions in occupational environments.

WBGT incorporates measurements that reflect evaporative cooling conditions and radiant heat, with air temperature also included in the calculation used for conditions with solar load.

The principal temperature measurements are:

MeasurementWhat it represents
Natural wet-bulb temperatureThe influence of evaporative cooling under the surrounding conditions
Globe temperatureThe combined influence of radiant heat and surrounding conditions on a globe sensor
Dry-bulb temperatureAmbient air temperature

WBGT is expressed in degrees Celsius, but a WBGT value is not interchangeable with an ordinary air-temperature reading.

The appropriate measurement approach and calculation depend on the exposure conditions, including the presence or absence of solar load.

ISO 7243:2017 describes a screening method for evaluating heat stress using the WBGT index in indoor and outdoor environments, subject to the standard’s scope and limitations.

When Should a Workplace Arrange Heat Stress Monitoring?

Heat stress monitoring is useful when workers encounter hot conditions, significant radiant heat, demanding physical tasks or clothing that restricts heat loss.

Reasons for commissioning an assessment include:

  • Hot working conditions near furnaces, ovens, boilers or heated equipment.
  • Outdoor work exposed to direct sunlight.
  • High humidity combined with physical work.
  • Worker complaints about excessive heat.
  • Tasks involving restrictive or insulating PPE.
  • Inadequate cooling or air movement in occupied areas.
  • Introduction of new heat-generating equipment.
  • Changes in production, staffing, shift duration or work practices.
  • Seasonal reviews before or during hotter weather.
  • Occupational hygiene or client audit requirements.
  • Verification after ventilation, insulation or other control improvements.

Process-generated heat can require assessment throughout the year. Outdoor assessments should reflect the weather, timing and work conditions relevant to the purpose of the study.

Heat Stress Assessment Services Offered by Perfect Pollucon LLP

Indoor Heat Stress Assessment

We assess thermal conditions in enclosed and semi-enclosed workplaces where process heat, humidity, restricted airflow or physical workload may contribute to heat exposure.

Typical areas include:

  • Production floors.
  • Furnace and heat-treatment areas.
  • Boiler houses and utility rooms.
  • Commercial kitchens and industrial bakeries.
  • Drying and curing sections.
  • Foundries and forging operations.
  • Processing and packaging areas.
  • Warehouses and loading bays.
  • Maintenance work areas.

The assessment considers the locations workers actually occupy and the tasks performed there.

Outdoor WBGT Monitoring

Outdoor assessments consider sun exposure, changing environmental conditions, physical work and the availability of suitable recovery areas.

Applications include:

  • Construction and infrastructure projects.
  • Roadwork and paving operations.
  • Outdoor loading and material handling.
  • Industrial yards.
  • Utility maintenance.
  • Rooftop work.
  • Outdoor plant operations.

Monitoring locations and periods are selected to represent the work being assessed. A shaded reading should not be assumed to represent a worker performing a task in direct sunlight.

Task-Based Heat Exposure Assessment

Area readings are evaluated alongside the activities of relevant workers or job groups.

Depending on the assignment, we review:

  • Task descriptions and physical workload.
  • Time spent in different thermal environments.
  • Work and recovery periods.
  • Clothing and PPE.
  • Movement between hot areas and cooler locations.
  • Acclimatisation information provided by the employer.
  • Normal and foreseeable operating conditions.

This helps connect environmental measurements to actual work patterns.

WBGT Data Logging and Time-Trend Monitoring

We provide WBGT and supporting environmental data logging to investigate how conditions change during selected monitoring periods.

Data logging can support:

  • Identification of hotter periods.
  • Comparison between production stages.
  • Review of changing outdoor conditions.
  • Investigation of intermittent heat-generating operations.
  • Comparison of work areas and recovery locations.
  • Assessment before and after control measures.

The logging interval, instrument deployment and monitoring duration are selected for the study objective.

A logged trend records conditions at the monitored location. Where workers move between areas, their time–activity pattern must also be considered when interpreting exposure.

Heat Stress and Ventilation Assessment

Where airflow or ventilation may contribute to the problem, we can combine WBGT assessment with relevant ventilation measurements.

Depending on the scope, this may include:

  • Air velocity at occupied work positions.
  • Airflow through selected openings or ducts.
  • Air distribution observations.
  • Supply and exhaust arrangements.
  • Identification of stagnant areas.
  • Air-change calculations where appropriate.
  • Review of the relationship between heat sources, airflow and worker positions.

Ventilation measurements and WBGT measurements answer different questions. A fan operating in a work area does not, by itself, establish that heat exposure is adequately controlled.

Learn more about our Industrial Ventilation Survey & Airflow Testing Services.

Assessment After Corrective Measures

We conduct follow-up measurements after changes such as:

  • Heat-source insulation.
  • Installation of radiant heat shielding.
  • Ventilation improvements.
  • Changes to work positions.
  • Provision of cooler recovery areas.
  • Modifications to task scheduling.
  • Changes in work–rest arrangements.

Where possible, comparisons are made under similar operating and environmental conditions. Material differences between surveys are documented when interpreting the results.

Industries and Workplaces We Support

Industry or workplaceTypical assessment areas
Foundries and metal processingMelting, casting, furnace operation and material handling
Forging and heat treatmentHeated components, ovens and associated workstations
Chemical and pharmaceutical manufacturingProcess areas, utility sections and tasks involving PPE
Food and beverage manufacturingCooking, baking, drying, steaming and hot processing areas
Construction and infrastructureOutdoor work, concrete operations, roofing and roadwork
Warehousing and logisticsLoading bays, hot storage areas and manual handling activities
Textile and garment facilitiesProcessing, pressing, drying and humid production areas
Paper, rubber and plastics manufacturingHeated processes, curing and production machinery
Power and utility operationsBoiler areas, hot equipment and maintenance tasks
Hotels, hospitals and institutional facilitiesKitchens, laundries and utility rooms
Engineering and general manufacturingProduction areas, maintenance and process-specific hot tasks

The assessment scope is based on actual exposure conditions rather than industry classification alone.

What We Measure and Review

Parameter or assessment inputPurpose
WBGTScreening and evaluation of thermal exposure against selected criteria
Natural wet-bulb temperatureSupporting WBGT determination
Globe temperatureAccounting for radiant heat effects within the measurement method
Dry-bulb temperatureRecording ambient air temperature
Relative humiditySupporting understanding of moisture conditions
Air velocityAssessing air movement where relevant to the investigation
Monitoring time and durationEstablishing when and for how long conditions were measured
Process operating conditionsUnderstanding whether the survey represents the intended operations
Physical workloadInterpreting exposure in relation to task demands
Clothing and PPEIdentifying factors that can restrict heat loss
Work–rest arrangementsReviewing exposure and recovery patterns
Acclimatisation informationSupporting selection and interpretation of appropriate criteria
Existing controlsIdentifying improvements and follow-up needs

The agreed scope identifies which parameters will be measured and which information will be obtained through observations or discussions with the site team.

How We Conduct a Heat Stress Survey

1. Understand the Assessment Objective

We discuss the reason for testing, the processes involved, potentially exposed job groups and any client or audit requirements.

A survey investigating a furnace operator’s exposure may require a different approach from an outdoor construction assessment or a general workplace screening study.

2. Review Work Areas and Tasks

Our team reviews the workplace layout, heat sources, worker positions, task duration, PPE and existing controls.

Where relevant, we identify groups of workers with similar tasks and exposure patterns to support a practical monitoring plan.

3. Plan Representative Monitoring

Monitoring locations and periods are selected to reflect the assessment objective.

The plan considers:

  • Process cycles.
  • Expected hot periods.
  • Shift arrangements.
  • Indoor and outdoor conditions.
  • Worker movement.
  • Work and recovery locations.
  • Variation between departments or tasks.

A short reading taken during a cooler or inactive period should not be presented as representative of an entire working shift.

4. Conduct On-Site Measurements

We use calibrated instruments appropriate to the monitoring scope and record relevant instrument details.

Field practice includes appropriate positioning, checks, sensor preparation where applicable and stabilisation before readings are interpreted. Calibration documentation is reviewed in relation to the parameters being measured.

5. Assess Workload and Exposure Context

Measurements are interpreted alongside task demands, clothing, exposure duration and the information available about work–rest patterns and acclimatisation.

Where the chosen method requires adjustments or time-weighted calculations, these are documented with the underlying assumptions.

6. Compare Findings With Selected Reference Criteria

The assessment identifies the technical reference and criteria used.

A conclusion should explain both the measured conditions and the assumptions supporting the comparison, rather than presenting an unexplained “pass” or “fail.”

7. Provide Findings and Recommendations

The report identifies areas requiring attention and sets out practical measures for the employer’s consideration.

Where a screening assessment is insufficient to resolve the concern, we identify the need for further investigation.

Standards and Technical References

Depending on the scope and client requirements, relevant references may include:

  • ISO 7243 for WBGT-based heat-stress screening.
  • ACGIH heat stress and strain guidance, where adopted for the assessment.
  • NIOSH occupational heat-exposure recommendations.
  • OSHA technical guidance on heat-stress assessment.
  • Applicable client standards and site-specific occupational health and safety requirements.

The selected method, edition and comparison basis should be recorded in the report.

Useful primary references include:

  • ISO 7243: Assessment of heat stress using the WBGT index
  • OSHA Technical Manual: Heat Stress
  • NIOSH Workplace Recommendations for Heat Stress

International technical guidance should not automatically be described as an Indian statutory limit. Where a legal-compliance opinion is required, the applicable requirements must be established for the facility.

Is There One Safe WBGT Limit for Every Workplace?

No. A single WBGT value cannot be used as a universal safe limit for all workers and tasks.

Interpretation depends on factors such as:

  • Physical workload.
  • Clothing and PPE.
  • Acclimatisation.
  • Exposure duration.
  • Work and recovery arrangements.
  • The selected assessment method.

A reading that is acceptable under one set of assumptions may require action under another.

WBGT assessment also does not certify an individual worker’s medical fitness or guarantee that heat-related illness cannot occur. Occupational medical advice and the employer’s heat-management arrangements remain important.

WBGT vs Temperature, Humidity and Heat Index

Measurement or indexMain useImportant distinction
Air temperatureDescribes how hot the air isDoes not independently capture radiant heat or task demands
Relative humidityDescribes atmospheric moisture conditionsIs not a standalone occupational heat-risk assessment
Heat indexCombines air temperature and humidityDoes not provide the same assessment as on-site WBGT with workload and clothing considerations
WBGTSupports assessment of thermal conditions, including radiant heat effectsRequires interpretation in the context of the work
Thermal comfort assessmentEvaluates whether occupants are likely to find an environment comfortableHas a different objective from occupational heat-stress screening

For example, a worker near a furnace may encounter significant radiant heat that an ordinary room-temperature reading does not adequately describe.

Likewise, a weather app cannot establish the conditions beside an industrial heat source or inside a specific production area.

What Is Included in Our Heat Stress Assessment Report?

Our report is structured to help EHS personnel, plant managers and technical reviewers understand what was assessed, how the findings were interpreted and what action may be appropriate.

Depending on the agreed scope, it includes:

Report sectionTypical contents
Assessment objectiveReason for the survey and scope of work
Facility and process contextRelevant operations and work areas
Monitoring planLocations, tasks, dates and measurement periods
Instrument detailsEquipment identification and calibration references
MethodologyMeasurement procedure and technical references
ResultsWBGT and supporting measured parameters
Time trendsLogged data summaries or graphs where included
Exposure informationWorkload, clothing, task duration and work–rest assumptions
InterpretationComparison with the selected criteria
FindingsAreas or tasks requiring attention
RecommendationsEngineering and work-practice measures for consideration
LimitationsConditions not assessed, information gaps and representativeness
Follow-upSuggested reassessment or further investigation

How to Read a WBGT Assessment Report

Start with the work area and task, then check the monitoring period and operating conditions.

Next, review the measured WBGT alongside the workload, clothing and exposure assumptions. Finally, read the reference criteria, findings and recommendations.

The WBGT number and its interpretation should be read together. A result without task information and a stated comparison basis may have limited value for decision-making.

Practical Recommendations Following Assessment

Recommendations are selected according to the identified sources of exposure and the site’s operating conditions.

Engineering Measures

Potential measures include:

  • Insulation of hot surfaces.
  • Radiant heat barriers or shielding.
  • Separation of workers from heat sources.
  • Improved ventilation or local cooling where appropriate.
  • Changes to equipment layout.
  • Mechanisation of demanding tasks.
  • Provision of suitable cooled recovery areas.

Work Organisation and Administrative Measures

Potential measures include:

  • Scheduling demanding tasks during more favourable periods.
  • Reviewing work and recovery arrangements.
  • Planning gradual exposure for workers who require acclimatisation.
  • Improving access to drinking water and recovery facilities.
  • Reviewing supervision and worker communication.
  • Establishing procedures for recognising and responding to heat-related concerns.
  • Reassessing conditions when processes, weather or work patterns change.

Clothing and PPE Review

Required protective equipment should not be removed simply to reduce heat exposure.

Where PPE contributes to heat burden, the employer should review suitable options and controls without compromising protection against the original hazard.

Recommendations are intended to support the facility’s EHS and occupational health teams. Detailed engineering design or medical evaluation can be defined separately where needed.

Choosing the Right Assessment Scope

Assessment optionSuitable objective
Initial WBGT screeningIdentify potentially concerning areas and priorities
Task-based assessmentEvaluate conditions in relation to specific jobs and exposure patterns
Time-trend or shift-based monitoringInvestigate variation over an agreed period
Combined heat stress and ventilation surveyExamine thermal exposure together with relevant airflow conditions
Follow-up assessmentReview conditions after corrective measures
Periodic or seasonal reassessmentTrack relevant changes in weather, operations or exposure

We help clients select the scope based on the question they need the assessment to answer.

Why Choose Perfect Pollucon LLP?

Established Environmental Monitoring Experience

Perfect Pollucon has provided environmental monitoring and consultancy services since 2007. Our work is supported by senior professionals with extensive field experience in industrial environments.

Assessment Connected to Actual Work

We consider work locations, tasks, process conditions and exposure patterns so that results are useful to the people responsible for workplace decisions.

Integrated Workplace Monitoring

Heat-stress assessment can be coordinated with related services, including:

  • Industrial ventilation and airflow testing.
  • Indoor air quality monitoring.
  • Personal noise dosimetry.
  • Workplace noise and illumination surveys.

Traceable Technical Reporting

Our reporting approach identifies the measurement conditions, methodology, comparison basis and limitations so that findings can be reviewed and acted upon.

Practical Follow-Through

We help clients understand the findings, prioritise further action and plan reassessment where required.

Heat Stress Assessment in Mumbai, Thane, Navi Mumbai and Maharashtra

Perfect Pollucon LLP is based in Thane and supports industrial and commercial facilities across the Mumbai Metropolitan Region and other Maharashtra industrial areas.

Mumbai, Thane and Surrounding Areas

  • Mumbai industrial and commercial facilities.
  • Thane and Wagle Estate.
  • Bhiwandi and surrounding warehousing areas.
  • Kalyan–Dombivli industrial areas.
  • Ambernath and Badlapur.
  • Murbad and Shahapur.
  • Vasai–Virar.
  • Palghar and Tarapur–Boisar.

Navi Mumbai and Raigad

  • Airoli, Rabale and Ghansoli.
  • Mahape and the TTC industrial area.
  • Turbhe and Pawane.
  • Taloja and Panvel.
  • Patalganga and Rasayani.
  • Khopoli.
  • Roha, Nagothane and Mahad.

Other Maharashtra Industrial Areas

Assignments can also be planned for:

  • Pune and Pimpri-Chinchwad.
  • Chakan, Talegaon and Ranjangaon.
  • Sanaswadi, Jejuri, Baramati and Kurkumbh.
  • Nashik, Ambad, Satpur and Sinnar.
  • Ahilyanagar industrial areas.
  • Chhatrapati Sambhajinagar, Waluj and Shendra.
  • Satara.
  • Ratnagiri, Chiplun and Lote Parshuram.

Visits to industrial areas within approximately 500 km of Thane are planned according to the site location, monitoring scope and mobilisation requirements. Contact us to confirm coverage for your facility.

Heat Stress Assessment Cost and Quotation

The cost of a WBGT assessment depends on the monitoring effort and level of interpretation required.

Key factors include:

  • Number of work areas and tasks.
  • Number of shifts or monitoring periods.
  • Survey duration and logging requirements.
  • Need for simultaneous measurements.
  • Indoor and outdoor coverage.
  • Travel and site-access requirements.
  • Additional ventilation measurements.
  • Reporting and client-specific documentation.
  • Follow-up assessment requirements.

For an accurate quotation, share:

  1. Facility name and location.
  2. Industry and main processes.
  3. Areas or job roles to be assessed.
  4. Shift timings and typical task duration.
  5. Known heat sources and relevant PPE.
  6. Reason for assessment or audit requirement.
  7. Preferred survey date and report deadline.

The proposed scope and reporting timeline are confirmed before the assignment.

Contact Perfect Pollucon LLP for a WBGT Assessment Quotation

Frequently Asked Questions

What is the difference between heat stress monitoring and heat stress assessment?

Monitoring records environmental conditions such as WBGT over a defined period. Assessment interprets those measurements alongside workload, clothing, exposure patterns and suitable reference criteria to identify concerns and recommended action.

Can you assess both indoor and outdoor workplaces?

Yes. We assess indoor, outdoor and semi-enclosed work areas. The monitoring method and interpretation are selected for the actual conditions, including solar and process heat exposure.

Is temperature and humidity measurement enough?

Temperature and humidity provide useful information, but they do not independently account for all factors relevant to occupational heat exposure. WBGT assessment is particularly useful where radiant heat, physical work or PPE need to be considered.

Do you provide WBGT data logging?

Yes. We provide data logging for agreed monitoring periods. The interval, duration and instrument locations are selected according to process variation, shift patterns and the study objective.

Is full-shift monitoring always required?

Not automatically. The required duration depends on the purpose of the assessment and how conditions and tasks vary.

A screening survey and a detailed exposure assessment may require different monitoring plans. Short measurements should not be used to make unsupported claims about an entire shift.

Can one WBGT reading represent the whole factory?

Usually, one reading cannot adequately represent areas with different heat sources, airflow, sun exposure or work patterns. Monitoring should cover representative locations and times relevant to the assessment.

Do workers’ activities affect the findings?

Yes. Physical work generates metabolic heat. The interpretation of WBGT therefore needs to consider workload rather than treating the same environmental reading as equivalent for every task.

Do you consider PPE and protective clothing?

Yes. Clothing and PPE are reviewed as part of the agreed assessment because they can affect heat loss. Relevant adjustments and method limitations are considered where applicable.

Can you recommend work–rest arrangements?

We can provide recommendations informed by the selected guidance, measured conditions and task information. Implementation should be coordinated with the employer’s EHS and occupational health teams and reviewed when conditions change.

Can the report support an EHS or client audit?

Yes. The report can provide documented evidence of the assessment, method, findings and recommendations. Please share specific audit requirements before monitoring so they can be addressed in the scope. Acceptance remains subject to the reviewing organisation’s requirements.

Is a calibrated instrument the same as an accredited assessment report?

No. Instrument calibration and accreditation of an assessment or testing activity are different matters. If your client requires a particular accredited scope or reporting arrangement, share that requirement before confirming the assignment.

Can heat stress testing be combined with ventilation or noise monitoring?

Yes. We can coordinate heat-stress assessment with ventilation, workplace noise, personal noise dosimetry, illumination or relevant air-quality monitoring. Each service retains its own measurement method and interpretation.

When should an assessment be repeated?

Reassessment may be appropriate following significant changes to processes, equipment, ventilation, work patterns, PPE or environmental conditions. It can also help evaluate corrective measures or address a periodic client requirement.

Does a satisfactory WBGT assessment guarantee that no worker will experience heat-related illness?

No. Findings relate to the conditions and assumptions assessed. Individual susceptibility, changing conditions and other factors remain relevant. Measurement should support an ongoing heat-management programme rather than replace it.

Arrange a Heat Stress & WBGT Assessment

Understand the thermal conditions your workers encounter and obtain a documented basis for improving workplace controls.

Perfect Pollucon LLP provides on-site heat stress assessments, WBGT monitoring, data logging and technical reporting in Mumbai, Thane, Navi Mumbai and industrial areas across Maharashtra.

Share your facility location, work areas, shift timings and assessment objective to discuss the appropriate scope.

Request a Site Assessment or Quotation

Environmental Monitoring Services

  • Ambient Air Quality Monitoring & Testing Services
  • Indoor Air Quality Testing & Monitoring Services
  • Air Quality Monitoring & Testing Services
  • Airborne Particle Count Testing Service for Cleanrooms, Server Rooms and Controlled Areas
  • Stack Emission Monitoring & Testing Services
  • Noise Level Monitoring & Testing Services
  • Data Centre Corrosion Testing Services
  • Airflow, Ventilation & ACH Testing Services
  • Personal Noise Dosimetry Testing Services for Industries
  • Illumination Survey
  • Electrical Thermography & Thermal Imaging Survey Services in Mumbai, Thane & Navi Mumbai
  • Compressed Air Leak Detection & Ultrasonic Leak Survey Services
  • Differential Pressure Testing & Cleanroom Pressure Mapping Services
  • Heat Stress & WBGT Assessment Services
  • Temperature and Humidity Testing Services in Mumbai, Thane & Navi Mumbai

Search

Download Our Brochure (682 kb)

Download Our Company Brochure

WhatsApp Chat with Perfect Pollucon Expert

Recent Posts

  • Compressed Air Leak Detection Guide for Industrial Plants
  • Compressed Air Leak Cost Calculator & Industrial Leakage Guide
  • Noise Dosimetry vs Area Noise Monitoring: Factory Guide
  • Noise Dosimetry Report: Dose, TWA, Leq & Peak Explained
  • Noise Dosimetry Study Procedure: Factory Preparation
  • Ai Agents Need A Compliance Stop Rule Before Environmental Automation Scales
  • Ventilation & Airflow Testing in Factories: ACH & Air Velocity Guide
  • How Is Cleanroom Particle Count Testing Conducted? A Step-by-Step Field Guide
  • Cleanroom Particle Count Limits: ISO 14644-1 Guide
  • Top 15 Field Failures in Stack Monitoring & How to Prevent Them | Expert Guide

Environmental Consultancy Services

  • Environmental Monitoring and Assessment
  • Environmental Impact Assessment
  • Effluent Treatment Plant
  • Effluent Treatment Plant Design
  • Consent to Establish, Consent to Operate and Renewal
  • Six Monthly EC Compliance Report Service
  • Self Audit Report MPCB
  • Environmental Compliance in India
  • Airflow, Ventilation & ACH Testing Services
  • Tools
  • HTML Sitemap

Environmental Consultancy Services

  • Environmental Monitoring and Assessment
  • Environmental Impact Assessment
  • Effluent Treatment Plant
  • Effluent Treatment Plant Design
  • Consent to Establish, Consent to Operate and Renewal
  • Six Monthly EC Compliance Report Service
  • Self Audit Report MPCB
  • Environmental Compliance in India
  • Airflow, Ventilation & ACH Testing Services
  • Tools
  • HTML Sitemap

Environmental Monitoring Services

  • Ambient Air Quality Monitoring & Testing Services
  • Indoor Air Quality Testing & Monitoring Services
  • Air Quality Monitoring & Testing Services
  • Airborne Particle Count Testing Service for Cleanrooms, Server Rooms and Controlled Areas
  • Stack Emission Monitoring & Testing Services
  • Noise Level Monitoring & Testing Services
  • Data Centre Corrosion Testing Services
  • Airflow, Ventilation & ACH Testing Services
  • Personal Noise Dosimetry Testing Services for Industries
  • Illumination Survey
  • Electrical Thermography & Thermal Imaging Survey Services in Mumbai, Thane & Navi Mumbai
  • Compressed Air Leak Detection & Ultrasonic Leak Survey Services
  • Differential Pressure Testing & Cleanroom Pressure Mapping Services
  • Heat Stress & WBGT Assessment Services
  • Temperature and Humidity Testing Services in Mumbai, Thane & Navi Mumbai

About Us

  • Home
  • Blog
  • Our Vision & Mission
  • About Us
  • Case Studies
  • Industries We Serve
  • Write for Us | Guest Posting
  • Privacy Policy
  • Terms and Conditions
  • Explore our EnviroTech platform: EHSSaral.com

Registered Office

Perfect Pollucon LLP – Environmental Consultancy Company
3 Krishna Koyna B, Majiwada Thane,
Maharashtra, India
400601
Email: [email protected]
Phone :
+91 9930 180 059
+91 7045 651 859
Perfect Pollucon Services (proprietorship firm reg. 2009) is now Perfect Pollucon LLP (CIN : ACP-2349) (reg in Jun’2025)

  • Privacy Policy
  • Terms and Conditions
  • Contact Our Experts
  • Sitemap
@Copyright Perfect Pollucon LLP
Heat Stress & WBGT Assessment Services